Verge Apartments

We are delighted to provide you with the latest updates for Verge Apartments, where every day brings us closer to the realisation of your future home. Our dedicated team of over 200 people have been hard at work on-site and we are excited to share the latest developments across the East and West Buildings.

From structural milestones including the installation of the roof to significant interior preparations, your investment is steadily taking shape. Read on to explore the specific achievements and progress across both buildings.

East Building

• External Wall Steel framing in the east building has been installed across levels 1, 2 & 3 and progressing.
• Floor set outs and floor cuts have been marked up across both buildings.
• Interior wall set out is progressing.
• Interior drainage distribution has commenced.

Image 1
Rectangle 3475
Image 1

West Building

• Roof guttering has been completed.
• External wall steel framing in the West building has been installed across levels 2 & 3 and progressing.
• Floor set outs and floor cuts have been marked up across both buildings.
• Interior wall set out is progressing.
• Interior drainage distribution has commenced.